# Villaem III (CHP-7320L)

The perfect fusion of function and design, activated with a single touch

- Category: Water Purifier
- Page: https://demo.coway.one/en/products/water-purifier/villaem3-chp-7320l

## Price range

- Monthly plan: THB 380 to THB 1,060/mo (Contract: 60 months, 84 months)
- Buy outright: THB 50,200 to THB 53,400

## Highlights

- Convenience at your fingertips: One touch is all it takes. No complex buttons or dials. Truly simple
- Eco Mode: Smart Energy-Saving: Automatically reduces power by sensing room light
- Dual Lock Mode: All Lock Mode: Prevents all water dispensing. Hot Lock Mode: Prevents accidental hot water dispensing
- Detachable Faucet: Quick-release nozzle for easy cleaning

## Specifications

### Color

- White
- Grey

### Filtration Technology

- Filtration Type: Reverse Osmosis (RO)
- Filtration Stages: 5-Stage
- No. of Filters: 3 EA

### Filter Type

- Ro Membrane: Main Filter
- Plus Neo-Sense: Sediment Filter
- Plus Neo-Sense: Pre-Carbon Filter
- Plus Inno-Sense: Post-Carbon Filter

### Sterilization

- UV Sterilization: UV-C

### Tank Capacity

- Total: 11.4 Litre
- Hot: 2.7 Litre
- Cold: 2.6 Litre
- Ambient: 6.1 Litre

### Electrical Power Specification

- Heater: 670 - 800 Watt
- Cooling Compressor: 0.6 A.
- Voltage / Frequency: 200 - 240 V / 50 Hz

### Product Dimension & Weight

- Dimension (W x D x H): 31 x 52.3 x 52 cm
- Net Weight: 23.7 kg

### Temperature Setting

- Hot: 3 Level ( 70°C  / 80°C  / 95°C )
- Cold
- Ambient
- Warm: 3 Level ( 40°C  / 50°C  / 60°C )

## More information

### 

1. Please inspect the equipment immediately after installation. If you encounter any issues, please notify the company within 7 days. (The company reserves the right to decline contract cancellation requests regarding these issues after this period).
2. Please prepare the installation area, including water and electricity systems, to ensure they meet standard requirements and are fully ready for installation and operation.
3. The product must remain at the original installation site throughout the contract period. If you wish to relocate the equipment, please notify the company in advance.

### 

1. The company reserves the right to terminate the contract if there is a default on payment or a breach of any terms and conditions. In such cases, the product must be returned in good condition, and all outstanding balances must be paid in full.
2. Early Cancellation Penalties:
2.1. 3-Year Contract
- Cancellation within the first 2 years: Must pay the remaining installments up to the 24th month + 50% of the remaining installments until the end of the contract.
- Cancellation after 2 years: Must pay 50% of the remaining installments until the end of the contract.
2.2. 5-Year Contract
- Cancellation within the first 3 years: Must pay the remaining installments up to the 36th month + 50% of the remaining installments until the end of the contract.
- Cancellation after 3 years: Must pay 50% of the remaining installments until the end of the contract.
2.3. 7-Year Contract
- Cancellation within the first 4 years: Must pay the remaining installments up to the 48th month + 50% of the remaining installments until the end of the contract.
- Cancellation after 4 years: Must pay 50% of the remaining installments until the end of the contract.
